Bathroom refurbishment in Putney bath, shower and toilet
were replaced but didn’t want to remove all the tiles. So here the tiled walls have been degreased. Wedi boarded where tiles were missing. I used a Levelling Primer to go over tiles as a base for Istinto which gives an excellent adhesion. I applied instinto and gave it pitted finish with a stippler. This is then finished in a chosen colour in Gioia before applying with a trowel and a 2 part epoxy resin to make it fully waterproof
Back To ProjectsGet in touch
Want to discuss a project with us? Please get in touch using the following methods